{"id":130187,"date":"2026-07-27T18:26:45","date_gmt":"2026-07-27T13:26:45","guid":{"rendered":"https:\/\/nationaltimes.pk\/eng\/?p=130187"},"modified":"2026-07-27T18:26:47","modified_gmt":"2026-07-27T13:26:47","slug":"water-supply-to-parts-of-karachi-resumes-after-power-at-dhabeji-pumping-station-restored","status":"publish","type":"post","link":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/","title":{"rendered":"Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">KARACHI(National Times)- Water supply to several parts of Karachi resumed in phases on Monday after electricity supply was resumed at the Dhabeji pumping station, around 22 hours after a power breakdown, Karachi Water and Sewerage Corporation spokesperson Abdul Qadir Shaikh told Dawn.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The spokesperson said K-Electric (KE) had restored power supply to the pumping station at 7:20am on Monday, around 22 hours after a cable fault suspended the supply at 8:43am on Sunday.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He said the \u201cprolonged outage had resulted in a shortfall of nearly 48 million gallons of water in the city\u201d and the affected areas included parts of North Nazimabad, Nazimabad, Gulberg Town, New Karachi, Landhi, Korangi and Scheme 33.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cFollowing the restoration of electricity, water supply to the affected areas has resumed in phases,\u201d the spokesperson said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Dhabeji pumping station, Karachi\u2019s primary water intake point, is highly dependent on uninterrupted electricity. Even brief outages result in immediate service disruptions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The power breakdown on Sunday had resulted in the temporary shutdown of three pumps at Dhabeji, which KWSC initially attributed to a cable fault.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The water utility\u2019s spokesperson had told Dawn that a technical team had reached the site to rectify the fault.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, a KE spokesperson had clarified that the fault in KDA Pumping Feeder 2, which supplies electricity to the Dhabeji Pumping Station, \u201cis internal in nature and is not related to K-Electric\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cPower supply to 19 out of 22 pumping motors at the Dhabeji Pumping Station is continuing as normal,\u201d the spokesperson had said, adding that a power utility team was in contact with the relevant authorities to assist KWSC in addressing the fault.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On Monday, after the power was restored, the KWSC official said while speaking to Dawn that the electricity supply had been disconnected due to a cable fault, and whether the fault in KE\u2019s cable was internal or external, it was the power utility\u2019s responsibility to rectify it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dawn reached out to KE for further details, but there was no immediate response.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Earlier this month, an electricity outage at Dhabeji had affected its K-2 Pump House, where the manifold chamber and main valves developed a fault. As a result, three major pumps at the K-2 Pumping Station had been temporarily shut down and water supply to several areas of Karachi was affected.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Last month, on June 1, supply from Hub Pumping Station was also suspended to parts of Karachi due to a fault in KE\u2019s main cable. KWSC said that the power suspension had resulted in a daily water shortfall of 85 million gallons per day (MGD) for the city.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It was the third consecutive day of power failures at key pumping stations disrupting distribution across the metropolis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On May 31, the city faced a shortfall of 122 MGD after electricity supply to the North East Karachi Pumping Station was disrupted due to a fault in K-Electric\u2019s main cable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The outage came just a day after an emergency shutdown at the Dhabeji Pumping Station, caused by a fault in a transformer at the grid station, forced 10 of the station\u2019s 21 pumping units to shut down.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KARACHI(National Times)- Water supply to several parts of Karachi resumed in phases on Monday after electricity supply was resumed at the Dhabeji pumping station, around 22 hours after a power breakdown, Karachi Water and Sewerage Corporation spokesperson Abdul Qadir Shaikh told Dawn. The spokesperson said K-Electric (KE) had restored power supply to the pumping station [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":130188,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-130187","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored - Nation<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored - Nation\" \/>\n<meta property=\"og:description\" content=\"KARACHI(National Times)- Water supply to several parts of Karachi resumed in phases on Monday after electricity supply was resumed at the Dhabeji pumping station, around 22 hours after a power breakdown, Karachi Water and Sewerage Corporation spokesperson Abdul Qadir Shaikh told Dawn. The spokesperson said K-Electric (KE) had restored power supply to the pumping station [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/\" \/>\n<meta property=\"og:site_name\" content=\"Nation\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-27T13:26:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T13:26:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nationaltimes.pk\/eng\/wp-content\/uploads\/2026\/07\/Untitled-design-30-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"670\" \/>\n\t<meta property=\"og:image:height\" content=\"370\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"humza Jahangir\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"humza Jahangir\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/\",\"url\":\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/\",\"name\":\"Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored - Nation\",\"isPartOf\":{\"@id\":\"https:\/\/nationaltimes.pk\/eng\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nationaltimes.pk\/eng\/wp-content\/uploads\/2026\/07\/Untitled-design-30-1.png\",\"datePublished\":\"2026-07-27T13:26:45+00:00\",\"dateModified\":\"2026-07-27T13:26:47+00:00\",\"author\":{\"@id\":\"https:\/\/nationaltimes.pk\/eng\/#\/schema\/person\/27efa35fa76e99f3ad7e7397d7332c16\"},\"breadcrumb\":{\"@id\":\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#primaryimage\",\"url\":\"https:\/\/nationaltimes.pk\/eng\/wp-content\/uploads\/2026\/07\/Untitled-design-30-1.png\",\"contentUrl\":\"https:\/\/nationaltimes.pk\/eng\/wp-content\/uploads\/2026\/07\/Untitled-design-30-1.png\",\"width\":670,\"height\":370},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/nationaltimes.pk\/eng\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nationaltimes.pk\/eng\/#website\",\"url\":\"https:\/\/nationaltimes.pk\/eng\/\",\"name\":\"Nation\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nationaltimes.pk\/eng\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/nationaltimes.pk\/eng\/#\/schema\/person\/27efa35fa76e99f3ad7e7397d7332c16\",\"name\":\"humza Jahangir\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nationaltimes.pk\/eng\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/43feedd99bd6a90080d1621b7e6604364acb673ee979d3ffe5075557c14c68b9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/43feedd99bd6a90080d1621b7e6604364acb673ee979d3ffe5075557c14c68b9?s=96&d=mm&r=g\",\"caption\":\"humza Jahangir\"},\"url\":\"https:\/\/nationaltimes.pk\/eng\/author\/humza\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored - Nation","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/","og_locale":"en_US","og_type":"article","og_title":"Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored - Nation","og_description":"KARACHI(National Times)- Water supply to several parts of Karachi resumed in phases on Monday after electricity supply was resumed at the Dhabeji pumping station, around 22 hours after a power breakdown, Karachi Water and Sewerage Corporation spokesperson Abdul Qadir Shaikh told Dawn. The spokesperson said K-Electric (KE) had restored power supply to the pumping station [&hellip;]","og_url":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/","og_site_name":"Nation","article_published_time":"2026-07-27T13:26:45+00:00","article_modified_time":"2026-07-27T13:26:47+00:00","og_image":[{"width":670,"height":370,"url":"https:\/\/nationaltimes.pk\/eng\/wp-content\/uploads\/2026\/07\/Untitled-design-30-1.png","type":"image\/png"}],"author":"humza Jahangir","twitter_card":"summary_large_image","twitter_misc":{"Written by":"humza Jahangir","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/","url":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/","name":"Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored - Nation","isPartOf":{"@id":"https:\/\/nationaltimes.pk\/eng\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#primaryimage"},"image":{"@id":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#primaryimage"},"thumbnailUrl":"https:\/\/nationaltimes.pk\/eng\/wp-content\/uploads\/2026\/07\/Untitled-design-30-1.png","datePublished":"2026-07-27T13:26:45+00:00","dateModified":"2026-07-27T13:26:47+00:00","author":{"@id":"https:\/\/nationaltimes.pk\/eng\/#\/schema\/person\/27efa35fa76e99f3ad7e7397d7332c16"},"breadcrumb":{"@id":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nationaltimes.pk\/eng\/2026\/130187\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#primaryimage","url":"https:\/\/nationaltimes.pk\/eng\/wp-content\/uploads\/2026\/07\/Untitled-design-30-1.png","contentUrl":"https:\/\/nationaltimes.pk\/eng\/wp-content\/uploads\/2026\/07\/Untitled-design-30-1.png","width":670,"height":370},{"@type":"BreadcrumbList","@id":"https:\/\/nationaltimes.pk\/eng\/2026\/130187\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nationaltimes.pk\/eng\/"},{"@type":"ListItem","position":2,"name":"Water supply to parts of Karachi resumes after power at Dhabeji pumping station restored"}]},{"@type":"WebSite","@id":"https:\/\/nationaltimes.pk\/eng\/#website","url":"https:\/\/nationaltimes.pk\/eng\/","name":"Nation","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nationaltimes.pk\/eng\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/nationaltimes.pk\/eng\/#\/schema\/person\/27efa35fa76e99f3ad7e7397d7332c16","name":"humza Jahangir","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationaltimes.pk\/eng\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/43feedd99bd6a90080d1621b7e6604364acb673ee979d3ffe5075557c14c68b9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/43feedd99bd6a90080d1621b7e6604364acb673ee979d3ffe5075557c14c68b9?s=96&d=mm&r=g","caption":"humza Jahangir"},"url":"https:\/\/nationaltimes.pk\/eng\/author\/humza\/"}]}},"_links":{"self":[{"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/posts\/130187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/comments?post=130187"}],"version-history":[{"count":1,"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/posts\/130187\/revisions"}],"predecessor-version":[{"id":130189,"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/posts\/130187\/revisions\/130189"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/media\/130188"}],"wp:attachment":[{"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/media?parent=130187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/categories?post=130187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nationaltimes.pk\/eng\/wp-json\/wp\/v2\/tags?post=130187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}